Days to go

Exhibitor Manual

How can we assist?

Loading dock

Updated on November 5, 2025

Loading and unloading is confined to the relevant loading and unloading areas, and materials handling areas applicable to the Licensed Area.

See road map image (below) on HKCEC website

Phase 1 Loading Dock Exit / Entrance – blue route

Only authorised personnel of the HKCEC may operate the sliding gate doors and shutters at the loading dock for freight vehicle entry.

Share this page :
Email
Facebook
LinkedIn
WhatsApp
Print