Loading and unloading is confined to the relevant loading and unloading areas, and materials handling areas applicable to the Licensed Area.
See road map image (below) on HKCEC website
Phase 1 Loading Dock Exit / Entrance – blue route
Only authorised personnel of the HKCEC may operate the sliding gate doors and shutters at the loading dock for freight vehicle entry.
